Bypass Mechelen
Railwaybridges - Mechelen (Belgium)
Railwaybridges KW06 and KW09 for the reorganisation of Mechelen railway station
Assignment: | ||
State: | Completed (2017) | |
Contractor: | Victor Buyck Steel Construction nv | |
Design: | TUC Rail | |
KW06: | 78 m, 1100 ton, crossing the Leuven-Dijle canal | |
KW09: | 52 m, 500 ton, crossing the Dijle |